Zum Hauptinhalt springen

Process Management & Measurement

  1. Akima, N.; Ooi, F.: Industrializing Software Development: A Japanese Approach. IEEE Software, March 1989, pp. 13-21
  2. Armour, P. G.: Real Work, Necessary Friction, Optional Chaos. Comm. of the ACM, 47(2004)6, pp. 15-18
  3. Armour, P. G.: The Laws of Software Process – A New Model for the Production and Management of Software. CRC Press, 2004
  4. Ashley, N.: Measurement as a Management Tool. in Kelly, M.: Management and Measurement of Software Quality, UNICOM SEMINARS, Middlesex, UK, 1993, pp. 31-50
  5. Atkinson, G.; Hagemeister, J.; Oman, P.; Baburaj, A.: Directing Software Development Projects with Product Metrics. Proc. of the Fifth International Software Metrics Symposium, November 20-21, 1998, Bethesda, Maryland, pp. 193-204
  6. Azuma, M.; Mole, D.: Software Management Practice and Metrics in the European Community and Japan: Some Results of a Survey. The Journal of Systems and Software, 26(1994)1, pp. 5-18
  7. Basili, V.R.; Caldiera, G.; Cantone, G.: A Reference Architecture for the Component Factory. ACM Transactions on Software Engineering and Methodology, 1(1992)1, pp. 53-80
  8. Bazzana, G. et. al.: Software management-by-metrics: practical experiences in Italy. Proceedings of the Tenth Annual Conference of Software Metrics and Quality Assurance in Industry, Amsterdam, 29 September - 1 October 1993, Section 6
  9. Becker, S.A.; Bostelman, M.L.: Aligning Strategic and Project Measurement Systems. IEEE Software, May/June 1999, pp. 46-51
  10. Belady, L.A.; Lehman, M.M.: A model of large program development . IBM System Journal, 3 (1976), pp. 225-252
  11. Bhowmick, S. S.; Madria, S. K.; Ng, W. K.: Web Data Management. Srpinger Publ., 2004
  12. Bianchi, A.; Caivano, D.; Lanubile, F.; Visaggio, G.: Evaluating Software Degradation through Entropy. Pro. of the Seventh International Software Metrics Symposium METRICS 2001, April 2001, London, pp. 210-220
  13. Boehm, B.W.: Industrial software metrics top 10 list. IEEE Software, (1987) September, pp. 84-85
  14. Boehm, B.; Huang, L. G.: Value-Based Software Engineering: A Case Study. IEEE Computer, March 2003, pp. 33-41
  15. Boone, G.: The Applicability of TQM to Software Development. Proceedings of the International Software Quality Conference, Dayton, Ohio, October 7-9, 1991, pp. 212-219
  16. Bradley, L.: Monitoring Developer-Centered SQA for the Analysis and Design Stages. Proceedings of the International Software Quality Conference, Dayton, Ohio, October 7-9, 1991, pp. 128-131
  17. Briolat, D.; Pogman, J.: User involvement influence on project productivity in a RAD environment: a quasi-experiment. Proc. of the ESCOM-SCOPE 2000, April 2000, Munich, Germany, Shaker Publ., pp. 65-72
  18. Bruegge, B.; Dutoit, A.H.: Communication Metrics for Software Development. Proc. of the ICSE'97, Boston, May 1997, pp. 271-281
  19. Brüggemann, K.: The Dashboard - A long and winding road. Proc. of the CONQUEST 2001, Nuremberg, Germany, September 2001, pp. 161-170
  20. Büren, G.; Dumke, R.; Ebert, C.; Münch, J.; Seufert, M.: MetriKon 2014 - Praxis der Software-Messung. Shaker-Verlag, Aachen, 2014, ISBN 978-3-8440-3163-8
  21. Buglione, L.; Abran, A.: ICEBERG: A Different Look at Software Project Management. Proc. of the 12th International Workshop on Software Measurement, October 7-9, 2002, Magdeburg, Shaker Publ., Aachen, pp. 153-167
  22. Buglione, L.; Abran, A.: LIME: A Three-Dimensional Measurement Model for Life Cycle Project Management. Proc. of the IWSM'99, Lac Superieur, Quebec, Canada, September 1999, pp. 108-119
  23. Buglione, L.; Quintano, N.; Reo, D.: Balanced it Scorecard and EFQM: A Balanced Approach to Performance Measurement for Software Intensive Organisations. Proc. of the FESMA'99, Amsterdam, Netherlands, October 1999, pp. 415-426
  24. Card, D. N.: Sorting Out Six Sigma and the CMM. IEEE Software, May/June 2000, pp. 11-13
  25. Cardenas-Garcia, S.; Zelkowitz, M.V.: A Management Tool For Evaluation of Software Design. IEEE Transactions on Software Engineering, 17(1991)9, pp. 961-971
  26. Chillarege, R.: The Marriage of Business Dynamics and Software Engineering. IEEE Software, November/December 2002, pp. 43-49
  27. Chulani, S.; Santhanam, P.; Hodges, B.; Anders, K.: Metrics-Based Management of Software Product Portfolios. IEEE Software, 24(2), pp. 56-71, 2007
  28. Cockburn, A.: Surviving Object-Oriented Projects – A Manager’s Guide. Addison Wesley, 1998
  29. Cole, R. J.; Woods, D.: Measurement Through the Software Lifecycle: A Comperative Case Study. Proc. of the 10th Annual Conference on Application of Software Metrics and Quality Assurance in Industry, Amsterdam, Netherlands, September 1993, Section 19
  30. Crnkovic, I.; Larsson, M.; Lüders, F.: Software Process Management using Software Configuration Management. Proc. of the ESCOM-SCOPE 2000, April 2000, Munich, Germany, Shaker Publ., pp. 201-209
  31. Curtis, B.: Maintaining the Software Process. Proceedings of the Confenrence on Software Maintenance, Orlando, Nov. 9-12 1992, pp. 2-8
  32. Cusumano, M.A.: The Software Factory: A Historical Interpretation. IEEE Software, March 1989, pp. 23-30
  33. Cusumano, M.; MacCormack, A.; Kemerer, C. F.; Crandall, B.: Software Development Worldwide: The State of the Practice. IEEE Software, November/December, 2003, pp. 28-34
  34. Dakhli, S.; Toffolon, C.: Software projects evaluation and control: a decision-oriented generic framework. Proc. of the FESMA'98, Antwerp, Belgium, May 6-8, 1998, pp. 107-120
  35. Daneva, M.: Assessing the Maturity Level of the Accelerated SAP Requirements Engineering Process. In: Dumke/Abran: Current Trends in Software Measurement, Shaker Publ., Aaachen, Germany, 2001, pp. 70-84
  36. Debou, C.; Liptak, T.; Pescoller, L.: Managing Software Process by Applying ami. Proceedings of the fourth IFAC/IFIP Workshop, Schloss Seggau, Austria, May 1992, pp. 103-108
  37. DeMarco, Tom: Controlling Software Projects – Management, Measurement & Estimation. Yourdon Press, New York, NY, USA (1982)
  38. DeMarco, T.; Lister, T.: Peopleware (Wien wartet auf Dich! Der Faktor Mensch im DV-Management). Carl Hanser Publisher, Munich, 1991
  39. De Vogel, M.: Measurement in support of business strategy, performance drivers and business results. Proc. of the 4th European Conference on Software Measurement and ICT Control, FESMA-DASMA 2001, May 2001, Heidelberg, Germany, pp. 297-314
  40. Dieste, O.; Juristo, N.; Moreno, A. M.: How Higher-Education Systems Influence Software Engineering Degree Programs. IEEE Software, July/August, 2004, pp. 78-85
  41. Dixon, D.: Integrated Support for Project Management. IEEE Software, 1988, pp. 49-58
  42. Doerfel, F.: Software Projects are Fuzzy (german). Proceedings of the Tool'91 Conference, Karlsruhe, November 1991, pp. 147-160
  43. Dumke, R.R.: Product Portfolios Management. In: P.A. Laplante: Encyclopedia of Software Engineering, Volume II, CRC Press Taylor & Francis Group, Boca Raton, USA, 2011, pp. 729-752
  44. Dumke, R.: Software Engineering. Vieweg Verlag, 2003, (465 S.) (ISBN 3-528-35355-4)
  45. Dumke, R.: Softwaremess-Communities & BSOA. In: Schmietendorf/Simon: BSOA/BCloud 2014 - 9. Workshop Bewertungsaspekte service- und cloudbasierter Architekturen, Frankfurt, 4.11.2014, S. iii- iv
  46. Dumke, R.; Ebert. C.; Heidrich, J.; Wille, C.: Messung und Bewertung von Software - Stand der Technik und Ausblick. Informatik-Spektrum, 36(2013)6, S. 508-519
  47. Dumke, R.; Lehner, F.: Software-Metriken - Entwicklungen, Werkzeuge und Anwendungsverfahren. Deutscher Universitätsverlag, Wiesbaden, Germany, 2000 (ISBN 3-8244-7120-5)
  48. Dumke, R.; Rautenstrauch, C.; Schmietendorf, A.; Scholz, A.: Performance Engineering – State of the Art and Current Trends. Springer Publ., 2001
  49. Dumke, R.; Richter K.; Georgieva, K.; Asfoura, E.: Process Improvement Based on Causal Networks. In: O. Ormandjieva; C. Constantinides; A. Abran; R. Lee: Eighth ACIS International Conference on Software Engineering Research, Management and Applications (SERA 2010), 24-26 May 2010, Montréal, Canada, IEEE Computer Society Los Alamitos, California, S. 285-291
  50. Dumke, R.; Schmietendorf, A.; Seufert, M.; Wille, C.: Handbuch der Softwareumfangsmessung und Aufwandschätzung. Logos-Verlag, Berlin, 2014, (570 S.), ISBN 978-3-8325-3784-5
  51. Dumke, R.; Schmietendorf, A.; Seufert, M.; Wille, C.: Handbuch der Softwareumfangsmessung und Aufwandschätzung. Logos-Verlag, Berlin, 2014, (570 S.), ISBN 978-3-8325-3784-5
  52. Dyer, M.: The Cleanroom Approach to Quality Software Development. John Wiley & Sons, 1992
  53. Ebert, C.: Evaluation and Application of Complexity-Based Criticality Models. Proc. of the Third International Software Metrics Symposium, March 25-26, Berlin, 1996, pp. 174-185
  54. Ebert, C.: Process Change Management in Large Organizations. In: Dumke/Lehner: Software-Metriken – Entwicklungen, Werkzeuge und Anwendungsverfahren, Deutscher Universitätsverlag, Wiesbaden, 2000, S. 183-188
  55. Ebert, C.: Project and Process Measurement. In. Schmietendorf/Wille: Beiträge zum empirischen Software Engineering. Shaker-Verlag, 2012, S. 17-34
  56. Ebert, C.: Complexity Traces -- An Instrument for Software Project Management. Proceedings of the Tenth Annual Conference of Software Metrics and Quality Assurance in Industry, Amsterdam, 29 September - 1 October 1993, Section 17
  57. Ebert, C.: Process Change Management in Large Organizations. in: Dumke/Lehner: Software-Metriken, DUV, 2000, (ISBN 3-8244-7120-5), pp. 189-220
  58. Elke, M.: Konzeption eines Kostenmodells für industrielles Messdaten-Management. Diploma Thesis, University of Magdeburg, Germany, 2006
  59. Emam, K. E.; Drouin, J. N.; Melo, W.: SPICE – The Theory and Practice of Software Process Improvement and Capability Determination. IEEE Computer Society Press, 1998
  60. Emam, K. E.; Koru, A. G.: A Replicated Survey of IT Software Project Failures. IEEE Software, 25(5), pp. 84-90, 2008
  61. Estol, C.: IT indicators: The CIO's information system. Proc. of the 4th European Conference on Software Measurement and ICT Control, FESMA-DASMA 2001, May 2001, Heidelberg, Germany, pp. 285-296
  62. Ezran, M.; Morisio, M.; Tully, C.: Pactical Software Reuse: the essential guide. Freelife Publ., Paris, 1998
  63. Fehlmann, T.: Six Sigma für Software Tagungsband des DASMA Software Metrik Kongresses (MetriKon 2003), November 10-11, 2003, Ulm, Shaker Publ., Aachen, pp. 1-18
  64. Fehlmann, T.: Using Six Sigma for Software Project Estimation - An Application of Statistical Methods for Software Metrics. In: Büren, G.; Dumke, R.: MetriKon 2009 - Praxis der Software-Messung, Shaker Verlag, 2009, S. 153-168
  65. Fenick, S.: Implementing Management Metrics: An Army Program. IEEE Software, March 1990, pp. 65-73
  66. Fernstroem, C.; Naerfelt, K.; Ohlsson, L.: Software Factory Principles, Architecture, and Experiments. IEEE Software, March 1992, pp. 36-44
  67. Fiegler, A.; Zenker, N.; Draheim, J.; Dumke, R.: System-Management in Large-Scale Cloud Systemen. In: Schmietendorf et. Al.: BSOA 2012 – 7. Workshop Bewertungsaspekte serviceorientierter Architekturen, Shaker-Verlag, Aachen, 2012, S. 73-86
  68. Fisher, D.T.: Myths and Methods - a guide to software productivity. Prentice Hall Inc., 1991 (260 p.)
  69. Fitzgerald, B.: Software Crisis 2.0. IEEE Computer, April 2012, S. 89-91
  70. Francis, R.: Quality and process management: a view from the UK computing services industry. Software Quality Journal, 2(1993)4, pp. 225-238
  71. Frühauf, K.: Process Anorexia and its Effects. Proc. of the CONQUEST 2001, Nuremberg, Germany, September 2001, pp. 27-28
  72. Frühauf, K.; Ludewig, J.; Sandmayr, H.: Software Project Management and Quality Assurance. (German), Teubner Publ. Stuttgart, 1993
  73. Gaulke, M.: Risikomanagement in IT-Projekten. Oldenbourg-Verlag, 2002
  74. Gencel, C.: How to Use COSMIC Functional Size in Effort Estimation Models? In: Dumke/ Braungarten/ Büren/ Abran/ Cuadrado-Gallego: Software Process und Product Measurement. LNCS 5338,Springer-Verlag, 2008, S. 196-207
  75. Gencel, C.; Buglione, L.; Abran, A.: Improvement Opportunities and Suggestions for Benchmarking. In: Abran/Braungarten/Dumke/Cuadrado-Gallego/ Brunekreef: Software Process and Product Measurement. LNCS 5891, 2009, S. 144-156
  76. Geringer, P.T.; Gulledge, T.R.; Mutzler, W.P.: Software Engineering Economics and Declining Budgets. Springer Publ., Berlin Heidelberg New York, 1994
  77. Gilb, T.: Principles of Software Engineering Management. Addison-Wesley Publ. Comp., New York, 1988
  78. Giordani, C.: Introducing quantitative project management in an SME. Proc. of the ESCOM-SCOPE 2000, April 2000, Munich, Germany, Shaker Publ., pp. 123-131
  79. Glass, R. L.; Ramesh, V.; Vessey, I.: An Analysis of Research Computing Disciplines. Comm. of the ACM, 47(2004)6, pp. 89-94
  80. Gonzalez, R.R.: A Unified Metric of Software Complexity: Measuring Productivity, Quality and Value. Proceedings of the Annual Oregon Workshop on Software Metrics, April 10-12, 1994, Silver Falls, Oregon
  81. Genuchten, M. V.; Hatton, L.: Quantifying Software's Impact. IEEE Computer, October 2013, S. 66-71
  82. Goodman, P.: Practical Implementation on Software Metrics. McGraw-Hill Inc., 1993
  83. Gorla, N.; Lam, Y, W.: Who Should Work with Whom? - Building Effective Software Projects Teams. Comm. of the ACM, 47(2004)6, pp. 79-82
  84. Guo, K.; Meng, L.: Organization Application Oriented Software Process Measurement Model. International Symposium on Computer Science and Computational Technology, 2008. ISCSCT '08. pp. 445-449
  85. Haddad, H.M.; Meredith, D.E.: Instituting Software Metrics in Small Organizations: A Practical Approach. Eighth International Conference on Information Technology: New Generations (ITNG), 2011, pp. 227-232
  86. Hofmann, I.: Ein Nutzen optimierender qualitätssichernder Messprozess für die Entwicklung eingebetteter Softwaresysteme. Reihe: Dumke (Hrsg.): Magdeburger Schriften zum Empirischen Software Engineering, Shaker Verlag, Aachen, 2005, 163 S., ISBN 3-8322-4158-2
  87. Huang, F.; Sun, T.: Software Project Metrics and Quality Management. Ninth International Conference on Intelligent Information Hiding and Multimedia Signal Processing, 2013, pp. 615 - 618,
  88. Humphrey , W.S.: Managing the Software Process. Addison-Wesley,1990
  89. Janus, A.; Dumke, R.: Aufwandschätzungen in Mikroprojekten – ein Erfahrungsbericht. In: Büren et al.: MetriKon 2013 – Praxis der Software-Messung, Shaker Verlag, Aachen, 2013
  90. Kauppinen, M.; Kujala, S.: Strating Improvement of Requirements Engineering Processes: An Experience Report. Proc. of the PROFES 2001, Kaiserslautern, Germany, September 2001, pp. 196-209
  91. Kenett, R. S.; Baker, E. R.: Software Process Quality – Management and Control. Marcel Dekker Inc., 1999
  92. Keung, J.: Software Development Cost Estimation using Analogy: A Review. Proc. of the ASWEC 2009, April 14-17, 2009, Gold Coast, Australia, S. 327-336
  93. Kitchenham, B.A.: Measuring to manage. in Mitchell, R.J.: Managing Complexity in Software Engineering. IEE Computing Series 17, London, 1990, pp. 153-166
  94. Krasna, M.; Rozman, I.; Stiglic, B.: How to Improve the Quality of Software Engineering Project Management. Software Engineering Notes, 23(1998)3, pp. 120-125
  95. Kütz, M.: IT-Controlling für die Praxis – Konzeption und Methoden. dpunkt-Verlag, Heidelber, 2005
  96. Kunz, M.; Braungarten, R.; Dumke, R.: Bewertungsansätze und Modelle für unternehmensweite Software-Messinitiativen. ASQT 2006, Klagenfurt, 14.-15. September 2006
  97. Lajios, G.: Software Metrics Suites for Project Landscapes. 13th European Conference on Software Maintenance and Reengineering, 2009. CSMR '09. pp. 317 - 318
  98. Lecky-Thompson, G. W.: Corporate Software Project Management. Charles River Media Inc., USA, 2005
  99. Leszak, M.: Practical Product and Process Measurement - Lessons Learned from 6 Years of Experience. In: Dumke, R. (Hrsg.): Software-Metriken in der Praxis, Shaker-Verlag, Aachen, 2001, S. 75-101
  100. Liu, P.; Du, Z.: E-commerce Performance Assessment Research Based on the D-S Theory and the Balanced Score Card Method. Proc. of the 2008 International Seminar on Future Information Technology and Management Engineering, IEEE Computer Press, pp. 120-123
  101. Loconsole, A.: Measuring the requirements management key process area. Proc. of the ESCOM 2001, April 2001, London, pp. 67-76
  102. Martino, S. D.; Ferrucci, F.; Gravino, C.; Mendes, E.: Comparing Size Measures for Predicting Web Application Development Effort: A Case Study. Proc. of the ESEM, Madrid, September 20-21, 2007, S. 324-333
  103. Miller, S.E.; Tucker, G.T.: Software Development Process Benchmarking.Proc. of the IEEE Global Telecommunications Conference, December 2-5, 1991, pp. 153-157
  104. Mitani, Y.; Ohwada, Y.; Maeda, G.; Matsumoto, K.: Nine Years Challenge of In-process Measurement Platform for Software Development Project: Distribution of a New Generation Platform and a Collaborative Research Proposal. Joint Conference of the 22nd International Workshop on Software Measurement and the 2012 Seventh International Conference on Software Process and Product Measurement (IWSM-MENSURA), 2012, pp. 115-120
  105. Mutafelija, B.; Stromberg, H.: Systematic Process Improvement Using ISO 9001-2000 and CMMI. Artech House, Boston, 2003
  106. Nelson, H. J.; Monarchi, D. E.; Nelson, K. M.: Ensuring the "goodness" of a conceptual representation. Proc. of the 4th European Conference on Software Measurement and ICT Control, FESMA-DASMA 2001, May 2001, Heidelberg, Germany, pp. 49-60
  107. Nitze, A.; Schmietendorf, A.; Dumke, R.: An Analogy-Based Effort Estimation Approach for Mobile Application Development Projects. Proc. of the IWSM/Mensura 2014, Rotteerdam, Netherlands, 6. - 8.Oct. 2014, CPS Publishing Service, Session New Approaches (online)
  108. Nonaka, M.; Kanno, K.; Matsushita, S.; Azuma, M.: Adapting Software Development Process for Customer Requirements and Personnel Capabilitiy. Proc. of the ESCOM 2001, April 2001, London, pp. 427-435
  109. Pandian, C. R.: Software Metrics – A Guide to Planning, Analysis, and Application. CRC Press Company, 2004
  110. PMBOK: A Guide to the Project Management Body of Knowledge (PMBOK). 3. Edition. PMI (Project Management Institute). American National Standard ANSI/PMI 99-001-2004, (2004)
  111. Porta, N. F.: Die Requirement Points Analyse - ein Ansatz zur Aufwandschätzung im Requirements Engineering. In: Büren, G.; Bundschuh, M.; Dumke, R.: MetriKon 2005 - Praxis der Software-Messung. Shaker-Verlag, Aachen, 2005, S. 201-212
  112. Porter, A.A.; Selby, R.W.: Evaluating Techniques for Generating Metric-based Classification Trees. The Journal of Systems and Software, 12 (1990), pp. 209-218
  113. Royce, W.: Software Project Management. Addison-Wesley, 1998
  114. Schmietendorf, A.: Eine strategische Vorgehensweise zur erfolgreichen Implementierung serviceorientierter Architekturen in großen IT-Organisationen. Shaker Publ., 2007
  115. Schmietendorf, A.; Dumke, R.: Entwicklung und Einsatz von Big Data Applikationen: eine kritische Betrachtung der einhergehenden Aufwände. In: Büren et al.: Praxis der Software-Messung, Shaker-Verlag, Aachen, 2014, S. 195-204
  116. Schmietendorf, A.; Wille, C.: Beiträge zum empirischen Software Engineering - eine Bilanz. Shaker-Verlag, Aachen, 2012
  117. Seidl, R.; Sneed, H.: Softwareevolution. dpunkt-Verlag, 2013
  118. Sneed, H. M.: Software Projektkalkulation. Hanser-Verlag München, 2005
  119. Sroka, J.V.; Gosling, C.A.: Using Quantitative Activity Models in Project Management. in: Kitchenham;Littlewood: Measurement for Software Control and Assurance. Elsevier Science Publisher Ltd, 1989, pp. 181-200
  120. Stark, G.; Durst, R.C.; Vowell, C.W.: Using Metrics in Management Decision Making. IEEE Computer, September 1994, pp. 42-48
  121. Taubner, D.: Effizientes Software-Engineering: Vorgehen für wirtschaftliche Projekte. Sonderausgabe Fachzeitschrift für Information Management & Consulting, Ausgabe Oktober 2003, S. 14-18
  122. Trojahn, M.: Softwareunterstützte Entscheidungsfindung für authentisierten Zugang in IT-Infrastrukturen aus ungesicherten Medien. Master Thesis, Universty of Magdeburg, Germany, 2011
  123. Vogelezang; F. W.: Portfolio Control – When the Numbers Really Count. In: Dumke et al.: Software Process and Product Measurement, Springer Publ., pp. 233-244, 2008
  124. Weiß, C.: Service Level Management zur Unterstützung von effizienten und effektiven Geschäftsprozessen. Diploma Thesis, University of Magdeburg, Germany, 2012
  125. Weller, E. F.: Using Metrics to Manage Software Projects. IEEE Computer, September 1994, pp. 27-33
  126. Wille, C.; Richter, K.; Massoud, A.; Dumke, R.: Gewährleistung von Team Effizienz im IT-Bereich. In: Büren et al.: Metrikon 2012 - Praxis der Software-Messung, Shaker-Verlag 2012, S. 95-106
  127. Witt, T. C.: IT Best Practices – Management, Teams, Quality, Performance, and Projects. CRC Press, Boca Raton, 2012
  128. Yazbek, H.; Dumke, R.; Schmietendorf, A.; Neumann, R.: Service-oriented Measurement Infrastructure. In: O. Ormandjieva; C. Constantinides; A. Abran; R. Lee: Eighth ACIS International Conference on Software Engineering Research, Management and Applications (SERA 2010), 24-26 May 2010, Montréal, Canada, IEEE Computer Society Los Alamitos, California, S. 303-308